Status from 18th March to 08th April
ALLOTMENT Status 6B Area – Bushes and Berries Only
08th April –Hoed. Note: The trench area had much soil in it. Upon investigation, (I assume) rabbits had tunneled just under this area and tunnels were destroyed and trenches rebuilt
25th March – Hoed – No other work required.
18th March – No work required at present on this area. I will monitor growth of berry / bushes and strap to lines when needed. Some have been strapped on already.
Video also attached















